BASELINE

The Integrated River Engineering Project on the Danube to the East of Vienna comprises the Danube section east of Vienna, from the Freudenau power plant to the Austrian-Slovakian border (river kilometres 1921 to 1872.70). This river section shows deficits in the fields of hydro-engineering, inland navigation and ecology calling for extensive action.

The targets defined for the project are to halt the progressive deepening of the Danube river

bed, to achieve a lasting improvement of navigation conditions and to improve the ecological situation in the Danube floodplains. Keeping in mind the need for flood protection measures, these improvements will be achieved through river engineering measures only; the free-flowing section will be maintained.

Read more about the problem areas and targets and about the project and measures.

Bereiche von via-donau
via donau

Tasks, objectives and projects of Austria's waterway management and development company

Navigation

Information on transports plus facts and figures for the Danube waterway

DoRIS

Services and information for inland waterway transport operators on the Danube

FGP

Integrated River Engineering Project on the Danube to the East of Vienna

March

Realisierung eines nachhaltigen Hochwasserschutzes an der March.

Ports

Danube Ports Online

Blue Pages

via donau blue pages online